TickTalk 5 Kids GPS Smartwatch with Calling & SOS ⚡ $25 OFF TickTal

TickTalk 5 Kids GPS Smartwatch with Calling & SOS ⚡ $25 OFF TickTal

gray
Sale price  $35.89 Regular price  $134.99
Skip to product information
TickTalk 5 Kids GPS Smartwatch with Calling & SOS ⚡ $25 OFF TickTal

TickTalk 5 Kids GPS Smartwatch with Calling & SOS ⚡ $25 OFF TickTal

Sale price  $35.89 Regular price  $134.99
Color

TickTalk 5 is a top-rated 4G LTE kids smartwatch with real-time GPS tracking, voice and video calling, messaging, and SOS alerts to keep your child safe and connected.

Stay Connected: Voice, video calls, and messaging keep you in touch anytime, anywhere.
Safety First: Real-time tracking, AI-powered SmartPin that learns and improves GPS accuracy, instant SOS & 911 calls with app alerts, and unknown number blocking.
Kid-Friendly Apps: Reminders, activity tracker, and free music streaming keep your child engaged.
Full Parental Control: Manage contacts, set Focus modes, and approve app users for easy supervision.

Connect More, Worry Less

Voice,
FaceTalk & Emergency Calls

TickTalk 5 is a standalone 4G/LTE kids’ cellular smartwatch, supports voice and video calls through WiFi or cellular data. Designed for ease of use, enabling children to make instant calls to trusted contacts with a single screen touch, ensuring seamless communication anytime, anywhere.

The watch includes quick-dial buttons for 911 and other emergency contacts, sending instant notifications to parents following an emergency call. In urgent situations and added safety, the admin on the parent app can utilize the remote answer feature to listen in on their child’s surroundings at any time.

SMS and in-app chat give kids flexible ways to stay connected with Talk-to-Text, voice messages, photos, emojis, and GIFs.
SMS works with families who don’t use the TickTalk App, while in-app chat adds encryption and full parental control. Both are limited to parent-approved contacts only.

Available with tOS 5.5.0 or above.

Superior Performance

TickTalk 5, featuring unique SignalBooster technology, delivers unmatched signal coverage, significantly outperforming similar devices. Supporting 4G LTE networks worldwide, with Wi-Fi and Bluetooth capabilities.

Optimized firmware and a high-performance battery provide up to 100+ hours of standby time and 48 hours of regular use. Stay connected longer with reliable performance.


The built-in 5MP camera captures stunning photos, allows for playful selfies, and ensures clear video calls, making every moment memorable.

TickTalk 5 features the most accurate real-time location tracking and history route playback. We’ve also introduced Location SmartPin, the first and only AI-powered system for kids’ smartwatches available in the U.S.

This innovative feature allows parents to pin the correct location when an occasional inaccuracy occurs, helping the AI learn and optimize GPS accuracy over time. With Location SmartPin, TickTalk ensures pinpoint accuracy, even indoors, with algorithms that continuously improve with each interaction. Enjoy peace of mind knowing your GPS is the most precise on the market.

You may also like